Roof Replacement Under Solar Panels in Crestwood, IL

Array off, new shingles down, array back up, with every step on one schedule you can follow.

Two Trades, One Plan

Putting a new roof under solar panels means two trades sharing one roof. One crew handles the solar. Another handles the shingles. When nobody connects the two, things slip. The panels come off early and sit for weeks. Or the roofer shows up and the array is still there. Or the reset gets rushed before anyone has sorted out how the mounts will be sealed. We avoid all of that by treating the whole thing as one coordinated plan from the first call. We set the sequence: shutdown and removal, storage, roof replacement on a clear deck, new mounts and flashing, then reinstall and testing. Everyone knows the order and the dates. You get a single person to call about the solar side and a roofing schedule that is built around it, rather than squeezed in. On homes around Crestwood, where a lot of roofs are coming due after years of Chicago-area winters, this is the most common job we see. The goal is simple. You end up with a new roof that stays dry where the mounts go through it, and a solar system that is back on and producing, without having to referee two contractors.

What the Coordinated Job Covers

The full sequence, start to finish, with the solar work tied to the roofing schedule.

  • One schedule

    Removal, roofing and reinstall booked side by side, so the panels never sit around.

  • Power off, array down

    Electrical shutdown first, then modules, rails and conduit come off the roof.

  • Labeled storage

    Every panel and part tagged, logged and protected during the roof work.

  • Open deck for the roof

    The roof is replaced with nothing in the way, so the work is done right.

  • New mounts

    Fresh attachments set into the new roof where the array will sit.

  • Flashing at every penetration

    Each mount and conduit pass sealed into the new roofing layers.

  • Reinstall in the original layout

    Panels go back where they were, wired and reconnected as before.

  • Production test

    Output checked against the pre-removal reading before the job is closed.

How the Reroof Comes Together

  1. Map it out

    We talk through the roof, the array and your timeline, then look at both. A firm price on the panel work follows, usually within 48 hours, along with a sequence everyone can follow.

  2. Strip and reroof

    Modules head to storage, your roofer lays the new roof on a bare deck, and new mounts plus flashing follow once the shingles are down.

  3. Reset and confirm

    Panels go back in their original positions, everything gets wired up again and we test the output. The before and after records go into your file.

Why Homeowners Plan It This Way

  • No refereeing

    You are not stuck in the middle passing messages between a roofer and a solar crew.

  • Shortest downtime we can manage

    Dates set together mean the panels spend as little time off the roof as possible.

  • Sealed where it counts

    The spots where mounts go through the new roof get the closest attention.

  • One coordinated plan
  • Clear deck
  • New flashing
  • Tested at the end