Skip to content
Detach and reset scheduled around your roofer's date (708) 412-5366
Solar Panel Removal Crestwood logo
Close-up of overlapping blue solar panels on a rack

Off, stored, back on

Solar Panel Removal and Reinstallation in Crestwood

Your array comes down for the roof work, waits in labeled storage and goes back up on fresh mounts, tested before we leave.

The Roof Needs to Go. The Solar Needs to Come Back.

Here is the problem. Your roof is worn out, and there is a solar array bolted to it. Your roofer cannot tear off shingles under live panels, and you do not want a roofing crew guessing at electrical work. That is where a detach and reset comes in. We start with a careful electrical shutdown and disconnect so the system is safe to touch. Then the panels come off, followed by the racking and the conduit. Every panel is labeled and logged on an inventory sheet, so it can come home to the same slot it left. All of it heads to storage while your roofer works on a clear deck. When the shingles are on, we bolt down fresh mounts and re-flash each roof penetration. Each panel returns to its old position, the system gets reconnected, and we test it. Not a quick glance at the inverter, a real check that the array is producing like it did before removal. You walk away with a paper trail for the whole job, from the photos we took before the first bolt came out to the readings after the reset. Homes all over Crestwood are reaching reroof age with solar already on top, and this is the job that keeps both investments working.

What a Detach and Reset Covers

Every job is a little different, but these pieces show up on nearly all of them.

  • Safe shutdown

    Power is cut and the array isolated before anyone lifts a panel.

  • Before photos and a baseline

    The layout, wiring and current output are recorded so the reset can be checked against them.

  • Panels, racking and conduit off

    The whole array comes down, not just the modules, so the roofer gets an open deck.

  • Labeled inventory

    Each panel and part is tagged and logged, so nothing gets mixed up or lost.

  • Protected storage

    Panels and hardware are kept padded and out of the weather for the whole reroof.

  • New mounts and flashing

    Brand-new attachment hardware, each one flashed into the fresh shingles.

  • Reinstall and reconnect

    Panels go back where they started, wired up and reconnected as one system again.

  • Production test and paperwork

    Output checked against the baseline, monitoring reconnected, and the job documented for your records.

How the Job Moves

  1. Call and look

    You tell us about the roof project and your roofer's timeline. We check the array, mounts and wiring, snap photos and write down current production. Then you get a firm quote, usually within 48 hours.

  2. Down before tear-off

    On the scheduled day, we shut the system down, remove the panels, racking and conduit, label every piece and move it all into storage. Your roofer shows up to a clear roof.

  3. Back up and tested

    With the new roof finished, fresh mounts and flashing go on. Every panel returns to its slot, gets reconnected and gets tested against the baseline. We hand over the paperwork when it is producing.

Why Homeowners Call Us for This

  • We finish with a test

    The job is not done when the last bolt is tight. It is done when the system is producing again.

  • Nothing gets mixed up

    A tag on every panel and a written log mean each one finds its own spot again.

  • Fresh seals on the new roof

    Old mounts do not get reused on a new roof. Each penetration gets new flashing.

  • Safe shutdown
  • Every panel labeled
  • New flashing
  • Production tested

Got a Roof Date on the Calendar?

Give us the date and a rough panel count. We will tell you what the detach and reset costs and how we fit it around your roofer.