For roofing crews
Detach and Reset for Roofing Contractors in Crestwood
The array is off before your crew arrives and back on after the new roof is done, with dates you can plan around.
Your Crew Shows Up to a Clear Deck
If you roof in the south suburbs, you already know the drill. You land a reroof, then spot the panels in the satellite photo and the schedule gets complicated. Your crew should not be pulling solar. It means electrical disconnects, conduit, racking, and modules that crack if someone sets them down wrong. We take that piece off your plate. Give us the job address, roughly how many panels and when you plan to strip the roof. We look at the array, give you a per-panel quote and lock in a removal day ahead of your start. On that day we shut the system down, disconnect it, remove the panels, racking and conduit, label every piece and take it all off the roof. Your crew walks onto an open deck. When your install is finished, you let us know and we come back for the reset: new mounts and flashing at each penetration, then every module set back into its old spot, reconnected and tested for production. Your foreman hears from us directly, never secondhand. If plans shift because of weather or a supply delay, we adjust with you. Your homeowner gets a working system and you get a job that finished on your timeline.
What Roofers Get From Us
The pieces that make a solar reroof run like any other job on your board.
Per-panel quotes
Simple pricing you can roll into your own bid without guesswork.
Removal before tear-off
The array is down and gone before your crew starts stripping shingles.
Conduit and racking cleared
Nothing left on the deck for your guys to work around or trip over.
Storage handled
Panels and hardware labeled and kept off your site and out of your way.
Reset after your install
New mounts and flashing go in once your roof is finished, not before.
Direct line to your foreman
Date changes and questions handled crew to crew, without a middleman.
Production test
The system is confirmed working before we leave, so the homeowner is happy.
Claim paperwork when needed
Itemized scopes and photos if the reroof is part of an insurance job.
Where We Slot Into Your Week
Send us the job
Job address, how many panels and when your guys start. We look at the array and send a per-panel number, usually within 48 hours.
We clear the roof
Ahead of your start date, we shut down, disconnect and remove the whole array. Everything is labeled and stored. Your crew gets a clean deck.
We reset when you finish
Shingles done? Give us a ring. Fresh hardware and flashing go down, the modules return, everything gets wired and tested, and you close out a job with a working system.
Why Crews Ring Us Back
We show up on the date
Your tear-off is planned around our removal. We treat that date like it matters, because it does.
Clean handoff
No rails, wire or conduit left behind on the deck when we hand it over.
Your customer stays yours
We do the solar piece and report back to you. We are not trying to take your client.
- Per-panel pricing
- Removal before tear-off
- Clean deck
- Reset and test
Have a Reroof With Solar on Your Board?
Send the address and the tear-off date over the phone. We will get you a per-panel number and a removal day that works for your crew.